The project involved the refit of an existing warehouse to accommodate the servicing of equipment within a 5,000sqm partitioned and air conditioned space. The design presented a challenge for Section J compliance due to the weight of required insulation on the ceiling. Co-Perform prepared a JV3 verification model that enabled lightweight insulation to be installed that was compatible with the ceiling structural capacity.